Step 1 - PLANNING
- Mark out your site with pieces of string or chalk for an even, clear idea of how your paving will look and also giving you straight edges to work with.
- Don't forget to allow for storm water run-off. Good drainage is essential.
- Ensure your area is flat and compacted using road-base, sand or concrete depending on the area.
|
|
Step 2 - MATERIALS
- Calculate the area accurately so you purchase the right quantities. To work out the area to be paved in square metres multiply the length by the width e.g. 4m x 5m = 20 square metres. Or ask your friendly Simon Seconds sales staff for help.
- To calculate the correct amount of Road Base you will require use this simple equation.Paving Area _____m2 x [layer depth(mm) / 1000 = _____m3 Road Base.
- To calculate the correct amount of Bedding Sand you will require use this simple equation.Paving Area _____m2 x [20mm / 1000] = _____m3 Bedding Sand.
- Always allow for up to 10% extra pavers for wastage such as cuts and if you are purchasing factory second pavers allow for the odd broken or damaged paver.
|
|
Step 3 - PREPARING THE SITE
- Remember paving must slope away from the building to allow for run off.
- Pavers should be flush with the lawn and be laid on your flat and compacted road-base, sand, or concrete.
- Compact thoroughly using a vibrating plate compactor, checking that the base drains in the required direction.
|
|